With the frame rails split apart it allowed us access to the backside of the frame rail and repair the frame properly.
How to install 1934 floor on frame.
There were a few areas on the frame that had been poorly repaired and this area was obviously cut out at onetime in its past lives for installation of duel exhaust.
To install a door jamb start by measuring the door frame and cutting the wood to size.
Install bridging on either end of the joists at a distance of of their total span.
This project guide features instructions on how to remove the old door position and install the new door and complete the installation with the door trim.
It feels like i have been talking about this step for weeks on end but its finally.
Today we are finally going to be welding the body and sub rails together.
To install standard metal bridging brace the pointed ends of the bars against the joists then nail down the open ends.
Then use a nail gun to secure the 2 pieces together before attaching the other side of the jamb in the same way.
In this video matt shows how he fabricated floor pans for his model a using some sheet metal and a handful of eastwood tools while offering a couple helpfu.
Pick a wall to start installing the floor sheeting from typically you will start at the same end that you laid out the floor joists from so you can start with a full or half sheet.
Installing a pre hung door is easier and faster than starting from scratch since most of the more labor intensive work is already done.
If your floors are 15 feet 4 6 m long for example you would position a brace 5 feet 1 5 m from either end.