Quick guide on how to install hardwood floor 300kb pdf our short installation guide for those with diy experience.
How to install glue down method of wood flooring.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Full guide complete installation instructions on installing your hardwood floor 1 5 mb pdf our full set of diy installation instructions.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
Our highly durable and secure glue down system incorporates a junckers liquid moisture barrier which is applied if necessary first to protect against higher than normal residual moisture in the subfloor.
The installation method recommended is not a full glue down installation but only a bead of glue across the width of the board.
Glue down hardwood floors is a good solution for large open areas where footsteps and drumming noise needs to be minimised.
In part 3 we will examine the pros and cons of choosing the glue down method of installation.
This is done by introducing glue to the nailing process.
This is your last chance to check if the ground is level and has no lumps or stray rocks so use it wisely.
Before the installation begins it is important to perform a thorough job site inspection.
Installing hardwood flooring glue down method step by step instructions.
This is recommended on all wide plank solid and engineered floors 5 and wider installed on a plywood or osb subfloor.
As you have read in part 1 part 2 there are multiple methods of installing hardwood flooring both engineered and solid.
Helpful tips for glue down installations.
The wall coverings and painting should be completed before the installation of the hardwood flooring.
Flooring selection lumber liquidators recommends engineered flooring for glue down applications or the more stable.
How to install glue down engineered wood flooring on concrete slab preparation.
After making sure the surface is completely level and clean place the substrate sheets on the ground and stretch them out properly.