Used when installing solid hardwood nail down installation is chosen due to how quickly and cost effectively it can be done.
How to install hardwood floors with nails.
Face nail each board at the point of every joist and set the nail with a nail set.
Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub floor and joist.
Finish hardwood floor installation when you get to the last few rows switch back to nailing by hand.
Option 2 face nail using electric brand nail gun or finish nail gun the first few rows of boards you install.
Pick one that is straight.
Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
Types of nails for laying hardwood floor.
Align the first board with the layout line with the tongue facing into the room.
Learn how to install solid hardwood flooring with a few simple tools.
Flooring nails have special qualities that make them suitable for the job.
Here s how to install flooring using the nail down method.
Hardwood floors are durable beautiful and a great diy project.
Solid hardwood flooring only can be installed on or above ground level with a plywood subfloor.
This will keep your very first rows straight where wall prevents the use of the floor nail gun.
Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
On the last row cut the pieces to fit measuring the distance from the wall to the board not the tongue minus the expansion gap.