Let the putty dry then lightly sand to make sure the surface is even.
How to install interlocking laminate flooring.
According to home depot if you re laying the laminate flooring in a room that s below grade or prone to high humidity and moisture you should also put down a vapor barrier to protect the floor from moisture.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
Install the underlayment or vapor barrier.
Click lock vinyl plank flooring also creates a floating floor but instead of having an adhesive connect the planks like gripstrip does the planks interlock with tongue and groove joints that easily snap together for a.
Cover putty with paint.
Set nail heads slightly below the surface of the molding and fill with wood putty.
Underlayment will give you a flat smooth surface to install the laminate flooring on.
If it is a concrete floor patch all holes deeper than two inches with a concrete floor patch compound.
Fill nail holes with wood putty.
If you have tried to install interlocking laminate flooring and failed a few tricks will help.
This thin dense foam layer helps to absorb sound provides a thermal barrier makes it easier to walk on the laminate and helps the flooring bridge minor gaps and bumps in the underlying floor.
Once the underlayment is down place inch.
Most diyers can complete laminate floor installation in one day.
Sweep the floor and clear it of any and all obstacles.
Use touch up paint to cover the putty.
Flooring manufacturers always recommend putting down underlayment before laying the laminate.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
Rip up the old flooring material and remove it.
How to install laminate flooring.
Jalynn baker how to install laminate flooring.
Planks can be cut with a hand saw circular saw or flooring cutter and most laminate flooring comes in planks that simply snap together with a tongue.