How to install vapor barrier on concrete floor under laminate flooring.
How to install moisture barrier on concrete for laminate flooring.
Install a plastic vapor barrier.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
Before rolling out the underlayment be sure to sweep vacuum and remove all debris on the substructure.
Always read the flooring manufacturers recommendations and instructions before installing the underlayment.
When you put in new hardwood or laminate flooring it is important to first install a moisture barrier which will.
The best way to install the vapor barrier is put it down before you put any laminate flooring down and what i m going to do is i m going to go ahead and cut a piece of tape so that way i can put.
For instance on concrete subfloors the moisture barrier installation is particularly important since concrete can grasp moisture and humidity for an extended time compared to other subflooring.
The main objective of the moisture barrier paint is to hold moisture from reaching the material of the laminate flooring coming from the subfloor below.
Vapor barrier 2 in 1 underlayment.