If you have concrete floors you can skip to step 6 step 1.
How to install rubber stall mats.
But what really is the best method to cut stall mats.
Use the 6 8 2 x 4 and carpenter s level to move the gravel around until the gravel in the entire stall is level.
Prepping a non solid subsurface.
For stalls with bare dirt or clay floors you will need enough gravel crushed rock sized 3 8 to 5 8 to fill the.
The compacted gravel should be about 1 below the desired finish line.
Gradually add 5 8 minus gravel spreading as you go up to the top of the 2 x 4.
First gather together the following supplies.
Uneven areas can be blocked with pressure treated or outdoor rated wood.
Well it s actually not that hard to do if you know how just like everything else.
Skip this step if your stall already has a lip or an edge at least 2 high.
Most of the stall mats you ll find in tack stores come in 4 x6 x3 4 size so you ll need 6 mats for a 12 x12 horse stall.
If you have a concrete asphalt or wood floor in your stall skip to step 8.
Compact gravel with hand compactor.
Use the garden rake to smooth and do a rough leveling of the gravel in the stall.
One of the things people ask is how to properly install rubber mats inside of your horse stall.
Horse stall mats are best installed over concrete asphalt wood or any level well compacted surface.
Clean the stall thoroughly.
Attach the treated 2 x 4 board across the inside of the stall doorway note.
Know how is what we want to cover here.
Installation technique here s how to install the mats.
Stall mats enough to cover the entire stall two vice grips four is even better carpet knife also called a utility knife straight.