How to put a wood floor on concrete.
How to install solid hardwood floors on concrete slab.
You don t want to try and glue it down either.
Installing hardwood on concrete is not a do it yourself project.
The easiest way to install hardwood is a floating floor.
You usually determine this with a meter that compares the relative humidity of the slab with the ambient humidity.
It s essential to choose the best option from the available types of floors for your hardwood installation on a concrete slab.
Laying a solid hardwood strip floor is easier and faster if you choose a prefinished product to avoid the extra work of sanding staining and finishing.
The reason why is because there are many tricky things you ll need to consider.
Solid hardwood floors are suitable for installing both at ground level and above ground level assuming the concrete is dry and that the right subfloor and vapor retarders are used.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Basement wood flooring options.
Before you prepare the concrete for hardwood flooring it must be dry.
Anytime you are installing real wood over concrete regardless of what thickness or material it is you will need to do some preemptive steps to ensure.
It looks like wallpaper.
Looking to install 600 sq ft of 3 4 unfinished hardwood on a concrete slab incognito said.
One is above grade level so water moisture problems should be of a lesser.
Some of these reasons are.
Humid conditions such as.
Hardwood type there is no way to install standard 3 4 hardwood on concrete.
Installing a hardwood floor over a concrete slab.
Even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
How to install a hardwood floor get step by step instruction on how to install hardwood floors in any room.
How to install solid hardwood flooring on concrete foundation size 3 b june 20 2004 i want to install a solid 3 4 cherry hardwood floor on top of a concrete foundation.
If the slab is new don t even begin moisture testing until 30 days after pouring it it probably won t be ready to be covered until 60 days after.
You have two basement wood flooring options solid hardwood or engineered.
Installing floors is a difficult diy job.
I have two floors to be installed above a slab concrete foundation.
Homes built on concrete slabs are good candidates for solid wood flooring provided that the slab does not wick up too much moisture.
As i wrote in the post you can go with other options such as engineered or click lock real wood flooring.