Apply your chosen adhesive to the subfloor and spread evenly using a notched trowel.
How to lay a concrete floor uk.
Don t add too much water as you want the mix to be fairly stiff.
For all you need to know about laying a concrete slab follow this step by step guide.
When ready to start place the floorboards out on the floor starting from the left hand corner and leaving enough space for expansion.
The first consideration you will need to make is how you are going to attach your planks to the floor.
Use whatprice to get up to 5 quotes for getting a concrete floor laid for you.
A floating floor is usually laid over a sub floor or over an existing floor after laying the right underlay.
This prevents excessive moisture loss from the concrete and acts as a damp proof membrane when used in concrete floors.
Position two or three 38mm battens depending on the width of the room on the concrete running in the direction you are working.
Start at the wall furthest away from the doorway and lay the concrete in strips across the room of no more than 600mm wide.
Top soil should be removed to the depths specified in the table below right.
The concrete slab needs to be made from a medium strength mix.
How to lay a perfect concrete floor in your home.
As you did when laying the concrete work across the floor area completing sections about 600mm at a time.
Concrete is the most versatile of all construction materials.
Floating a floating floor doesn t require any glue or nails although you may use glue between the tongue and the groove to keep the planks together.
Take a look at our comprehensive guide for all you need to know about laying a concrete garage floor concrete garage floors.
How to lay solid wood flooring over a concrete subfloor.
Before laying the screed dampen the concrete floor using water and a bonding agent mixed in equal parts.
Roll the tamper across the wet concrete to compact it.
Use a concrete roller to compact the concrete creating a stronger garage floor.
Concrete blocks are then laid horizontally between the joists resting on the lips and level with the top of the joists.
Concrete joists with lips on either side about halfway up are placed on the floor.
First you need to mark out where you are going to cast your slab.
Cut it to fit inside of the edging forms and cover the entire area of the concrete slab with rebar.
As the concrete is poured tamp it down.
A process called hydration makes concrete plastic and pliable when newly mixed strong and durable when hardened.
Lay down concrete reinforcing rebar wire mesh.
Readymix concrete should be laid on well compacted hardcore sub base that has been covered with a thin layer of sand and a layer of plastic sheeting.
As you re laying wood flooring on concrete your best option is to glue the flooring down using a solid wood adhesive.
You can use wooden pegs and string to mark out the area where the concrete is going to be poured allowing an extra 75mm for the formwork.
We suggest 1 part cement 2 1 2 parts sand and 4 parts aggregate.