Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
How to lay floating bamboo flooring on concrete.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
Place the grooved side of bamboo planks against the spacers.
My first video upload of one of my many home improvement jobs.
Floating the floor using uniclic flooring.
Installing parquet block bamboo flooring.
Lay out the planks for the first row calculate the length of the last plank and cut it with a saw remembering to allow for a 1 4 inch expansion gap at both ends of the row.
If you are using bamboo flooring with a click fitting system then just glue the planks to the concrete as you click them into place.
Trowel the adhesive directly onto the concrete floor working in sections and lay the bamboo planks directly on top.
Pour a self leveling floor compound onto the concrete to fill any low areas in the.
Secret nailing the floor down to a wood subfloor.
Floating the floor using tongue and groove flooring not parquet block.
Set spacers between the planks and the wall to maintain the 1 4 inch gap.
As you join planks end to end spread a small amount.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
Make sure you have a tube of bostik adhesive remover wipes handy to clean up glue spills asap because letting the glue cure on top of the flooring planks will damage the finish.
The floor must be completely flat before installing the bamboo.
Set 1 2 inch plastic spacers next to the longest wall and along the adjacent walls.
Assemble the bamboo flooring end to end snapping the ends together as you go.
Depending on the type of locking system that comes with your glueless click bamboo floor you can install the planks one of two different ways or sometimes both varies by manufacturer.
Move the plank gently up and down while pushing forward.
Position the plank at a 20 30 angle to the plank already installed.
If you are using bamboo flooring with a tongue and groove profile then you just fit the tongue and grooves together and glue the planks to the concrete subfloor.