Nail a 1 by 3 inch board across thresholds that are not high enough to contain the new floor level.
How to lay latex floor screed.
In this example roger uses bostik s cempolatex to level a floor with self levelling compound but the theory applies to most self levelling screeds and you ll see that it s not just a simple case of throwing the mixture on the floor and retiring while it spreads itself out.
You can also use a paint roller or finishing trowel if you don t have a screed.
A screed is a long flat tool used to make mortar even.
Always allow the new floor to set before laying your finished floor surface.
Latex floor screed is normally used to smooth the surface of concrete and screeds when laying thin vinyl or thin floor coverings.
For example bal level max can be tiled after 4 hours but must be left to set for 24 hours for other finishes such as vinyl or carpet.
A latex floor screed will smooth out those slight imperfections.
Slight imperfections in substrate will show up in these types.
Do not use self leveling compound over glazed ceramic tiles or over floors where a majority of the installed tiles have cracked.
Setting times can vary depending on your chosen product normally between 4 to 24 hours and is dependent upon your floor finish.
Latex floor screed is normally used to smooth the surface of concrete and screeds when laying thin vinyl or thin floor coverings.
Maximum depths are around 10 15mm however with the addition of bulking aggregates normally kiln dried sand some latex floor screed can go up to 30mm.
Make sure to fill in any dips in the floor.
Install new transition strips at the thresholds after the leveling compound cures.