Look at the board where it touches the subfloor and see if there are any dips bumps or otherwise uneven areas.
How to level a wooden floor for laminate.
Remember to pin down the barrier to keep it from shifting around.
To test for the flatness for laying laminate flooring on an uneven subfloor lay a 10 foot long 2x4 board.
Place wood shims between the subfloor and the top of the floor joist.
Wait for the compound to dry prior to laminate installation.
Feather the edges so they blend in with the surrounding floor.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Use a mixture designed for wood subfloors.
To level a subfloor for installing laminate follow the directions above to remove high and low spots.
5 double check your levelness and.
These hills and valleys will eventually lead to unwanted bouncy spots squeaks and groans in the final laminate floor.
After installing the moisture barrier select the thickest pad you can get to help level out the floor even more.
Mix the compound as directed on the package then pour it onto the low spots in the floor.
This will expose the subfloor underneath which is where most leveling problems lie.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Use a trowel to spread the material then allow it to dry before proceeding.
Tap them into place where needed with a hammer until you have leveled out the floor above.
Fill cracks or major voids with wood putty or a self leveling compound.
A plywood layer is not necessary if you are putting down wood laminate.
Apply floor leveling compound to any low areas or dips using a trowel.
Use a pry bar to pull up hardwood floors one section at a time or unfasten carpet or laminate and roll it up from one end.
After vacuuming or sweeping the subfloor to clean it add a plywood layer if the subfloor is in very bad shape but do not overlap the sheets.
If you re on a concrete subfloor you will need to lay down a moisture barrier before applying the pad.