You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
How to level floor before vct floor tile.
For more information download our pdf about types of subfloors.
When installing laminate vinyl tile or hardwood flooring it s important to know how to level a floor.
A subfloor is the bottom most structural level of your floor.
Before taking steps to level a floor you must find out why it s not level.
Preparation for installing floor tile depends on the type of subfloor in the room you are tiling.
Leveling a floor can be either a do it yourself project or a job for the pros depending on what s causing the problem.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Before we get started.
Most of these tools you probably already own and if you don t then you will need to get these tools to be able to do this yourself.
Vinyl floor tiles are more affordable versions of ceramic tile providing the same look and aesthetic without the actual price tag.
How to level a floor before installing vinyl floor tiles.
It supports your decorative floor finish whether it s carpet hardwood vinyl laminate or tile.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
Then mix leveling compound according to the instructions on the package in a large bucket.
Cover tile floors with floor leveling compound to create a hard level surface before placing a new floor covering.
Once the compound reaches a creamy consistency pour a thin layer into the sunken sections then smooth out inconsistencies with a hand trowel.
Leveling floors can be a diy project or left to professionals.
To properly install a new tile surface you should remove the existing vinyl tile grind down as much of the old tile adhesive as possible and then apply the leveling compound to smooth out the surface for the new tile.
Before we get started with the floor leveling there are a few tools you will see that i use in this step.
To level a floor start by removing the existing flooring.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
In construction projects leveling compound is most often laid down on the subfloor before the floor is even set.
Test the floor for moisture.