The first if the existing floor is not too uneven is laying the new solid wood floor over the existing boards at a 90 degree angle.
How to lay oak flooring on floorboards.
The solid oak flooring could then be simply nailed or screwed down.
Use an overlay flooring nailer also caller a porta nailer.
Timber floorboards how to protect your floors we ll show you an easy way to protect your floors from scuff marks damage and stains when you re having work done in or around your home.
There are basically two options you can consider.
One such area is laying an oak floor over a concrete sub floor.
Before installing a hardwood floor ensure that the existing wooden floor boards are flat level and dry.
A floating floor is usually laid over a sub floor or over an existing floor after laying the right underlay.
One method to overcome this when laying a solid oak floor would be using the above method of laying out battens.
Place 10mm spacers against the wall running parallel with the direction of your installation.
Depending on the size of your room it should take around two to three days to lay wood flooring although it has to be said that laying a fixed solid floor is a more time consuming task than installing engineered wood.
The results however speak for themselves.
03 57 timber floorboards how to sand timber floors learn how to use professional floor sanding equipment to sand a timber floor.
As time has progressed the need to fit oak flooring into ever changing conditions has increased.
To glue a wooden floor a full coverage of flexible wood adhesive must be applied to the sub floor and the boards.
Typically old softwood floorboards will be warped and or cupped making the surface irregular and therefore not the best support for your investment.
Installing solid wooden floors onto plywood.
Glued gluing your floor is often the most popular installation method as it is usually the most simple.